Kitchen
from $24,000
Bathroom
from $12,000
Flooring
from $10 / sq ft
Roof tear-off
from $15,000
Starting prices. Roofing shows the recommended tear-off. Each tier below explains what it includes.

THE SHORT ANSWER

What does remodeling cost in Southern California?

HOMEFRONT's 2026 working ranges for Southern California: kitchen remodels run $24K–$80K+, bathroom remodels $12K–$60K+, new flooring $10–$30 per sq ft installed, and a shingle roof tear-off $15K–$30K+ on a single-story home. The tier depends mostly on the work, not the finishes. Permits are never included, and neither are kitchen appliances. These are ranges for research, not quotes.

HOMEFRONT working ranges, all five counties
ProjectStarting atAcross the three tiersPriced
Kitchen remodeling$24,000$24K–$80K+per project
Bathroom remodeling$12,000$12K–$60K+per project
Flooring$10$10–$30per sq ft
Roofing$8,000$8K–$40Kper project

Roofing starts with an overlay, which few homes qualify for. The standard tear-off starts at $15,000.

BEFORE THE NUMBERS

How should I read these ranges?

  1. Start with the scope, then the price. Each tier is defined mostly by the work, not by a finish level. If your project needs work from the tier above, it belongs there, whatever the materials. Flooring is the exception: there, the material sets the installation work.
  2. “Starting at” is a real floor, not a teaser. It's the low end of the tier for a straightforward version of that job. Most projects land inside the range shown.
  3. Kitchen, bathroom and roofing tiers name the size they assume. Kitchens and bathrooms assume a standard room in the low and mid tiers and a larger one in the high tier. Roofing assumes a single-story home of about 1,800–2,500 sq ft. A bigger room or roof moves the number up.
  4. Ranges touch, and sometimes overlap, on purpose. A large, simple job in one tier can cost more than a small job in the next. The work decides the tier; the total doesn't.
  5. One set of numbers for five counties. Permits are never included. The ranges apply across Los Angeles, Orange, Riverside, San Bernardino and Ventura counties. Permit fees and requirements vary by city and county; the Authority Desk shows where to ask.
  6. A range is not a quote. Your number depends on your house: what's behind the walls, under the floor and on the roof deck. Use these to set expectations and to read proposals, then compare quotes line by line with the Scope Leveler.

01 / KITCHENS

How much does a kitchen remodel cost in Southern California?

Three things decide most kitchen budgets: how much of the room changes position, what turns up behind the walls once the cabinets come off, and the cabinets themselves. Appliances sit outside every range below. Homeowners usually choose and buy them separately, so they are never part of the number.

Low and mid assume a standard kitchen of about 120 to 200 sq ft, roughly 10×12 up to 13×15. For scale, the National Kitchen & Bath Association reported an average of about 161 sq ft in new single-family homes. High assumes a larger kitchen, over 200 sq ft.

Plan the kitchen project in the HOMEFRONT studio →
  1. Low$24K–$30K
  2. Mid$30K–$50K
  3. High$50K–$80K+

LOW

New surfaces, same footprint

Starting at$24,000Most projects: $24K–$30K.

Standard kitchen, about 120–200 sq ft

Who it fits. The layout works and nothing needs to move. The cabinets, counters and backsplash are simply worn out or dated.

What the work involves

  • Protect floors and the rooms around the kitchen
  • Remove the old cabinets, countertops and backsplash
  • Install new cabinet boxes and doors in the existing positions
  • Template, fabricate and install new countertops
  • Set a new tile backsplash
  • Reconnect the sink and the existing appliances in place

Why the price lands here

Cabinets and countertops are most of this budget. Because nothing moves, the wiring and plumbing behind the walls stay as they are, so fewer trades touch the job and there is less to open, patch and inspect.

What pushes it higher

Semi-custom or custom cabinet lines, natural stone or premium quartz, full-height backsplash or intricate tile.

Not included

  • Appliances
  • Permits and permit fees
  • New flooring
  • Drywall repair and painting beyond the backsplash

MID

Same layout, opened up and brought current

Starting at$30,000Most projects: $30K–$50K.

Standard kitchen, about 120–200 sq ft

Who it fits. The layout still works, but the room needs more than new surfaces: more outlets, better light, tired plumbing at the sink, damaged walls.

What the work involves

  • Everything in the low tier
  • Electrical work: new outlets and circuits, lighting under the cabinets and overhead
  • Plumbing updates at the sink, dishwasher and shutoffs
  • Drywall repair where the old cabinets and splash came off
  • Fresh paint through the kitchen

Why the price lands here

When the cabinets come off, the wall behind them is exposed. That is the cheapest moment the house will ever offer to fix what is inside it. This tier adds an electrician, a plumber and drywall finishing to the cabinet and countertop crews, and it is the work a homeowner notices every day after the dust settles.

What pushes it higher

A lighting plan with many fixtures, an electrical panel without room for new circuits, old galvanized or cast-iron drain lines.

Not included

  • Appliances
  • Permits and permit fees
  • New flooring

HIGH

A different kitchen, not a refreshed one

Starting at$50,000Most projects: $50K–$80K. Can run higher.

Larger kitchen, over 200 sq ft

Who it fits. A larger kitchen where the plan itself is the problem: the range is in the wrong place, a wall closes the room off, the work triangle never worked.

What the work involves

  • Everything in the mid tier
  • Relocating appliances, with new gas, electrical, water and ventilation runs to their new spots
  • Removing or opening walls between the kitchen and nearby rooms
  • New flooring through the whole space
  • More cabinetry and counter to fill a bigger room

Why the price lands here

Moving an appliance is never just moving a box. A range needs gas or a heavy circuit and a vent to the outside; a sink needs a drain that slopes the right way. Taking out a wall means patching floor and ceiling where it stood and running one floor through the new open room. A bigger kitchen also simply holds more of everything.

What pushes it higher

A load-bearing wall that needs an engineer and a beam, an island with a sink or cooktop, custom cabinetry, premium stone, new ductwork for a more powerful range hood.

Not included

  • Appliances
  • Permits and permit fees

02 / BATHROOMS

How much does a bathroom remodel cost in Southern California?

In a bathroom, the price follows the shower. A prefabricated unit, a tiled shower built from the studs and a rearranged primary bath are three different jobs with three different lists of trades, and that is what separates the tiers below far more than the vanity or the faucet.

Low and mid assume a standard hall bath of about 5×8. High is a primary bath. For a sense of how large an upscale project can get, the reference upscale bath in Remodeling magazine's Cost vs. Value report grows a 35 sq ft room to 100 sq ft; growing the room pushes a project above these ranges.

Plan the bathroom project in the HOMEFRONT studio →
  1. Low$12K–$20K
  2. Mid$20K–$35K
  3. High$35K–$60K+

LOW

Fresh fixtures, no tile work

Starting at$12,000Most projects: $12K–$20K.

Standard hall bath, about 5×8

Who it fits. A sound bathroom that is dated or worn. A good fit for a guest bath, a kids' bath or a rental.

What the work involves

  • Remove the old tub or shower, vanity and toilet
  • Install a prefabricated shower or tub with its surround
  • Set a new vanity and toilet
  • Paint the room

Why the price lands here

A prefabricated shower or tub arrives as finished panels, so there is no tile to set and no layered build-up of waterproofing behind it. The plumbing stays where it is. That keeps the labor down, which is most of the difference from the tier above.

What pushes it higher

Converting a tub to a shower and moving the drain, replacing the shower valve inside the wall, a larger or premium vanity.

Not included

  • New flooring (the existing floor stays)
  • Permits and permit fees

MID

A real tiled shower, built from the studs

Starting at$20,000Most projects: $20K–$35K.

Standard hall bath, about 5×8

Who it fits. The bathroom stays the same size and shape, but the shower should be a real, custom one.

What the work involves

  • Remove the old shower or tub and fixtures
  • Frame the shower, including a recessed niche and a bench
  • Build the shower pan and waterproof the walls and floor
  • Tile the shower walls and floor
  • Install a glass shower door
  • Electrical work for lighting, the exhaust fan and outlets
  • Plumbing for a new shower valve and trim
  • New vanity and mirror
  • Vinyl plank flooring, with the toilet reset on the new floor

Why the price lands here

A custom shower is built in layers: framing, a sloped pan, waterproofing, backer board, tile and grout. Every layer has to be right, or the water ends up inside the wall instead of in the drain. That is skilled, careful labor, and it is exactly where two proposals for the “same” shower tend to differ most.

What pushes it higher

Large-format or natural stone tile, tile to the ceiling, heavier glass, or mold and rot discovered behind the old shower.

Not included

  • Permits and permit fees

HIGH

The primary bath, rearranged

Starting at$35,000Most projects: $35K–$60K. Can run higher.

Primary bath

Who it fits. A primary bathroom where the layout itself changes, usually trading one tub-and-shower combination for two separate pieces.

What the work involves

  • Remove the existing bathroom
  • A new layout, with fixtures moved to new positions
  • Usually a tiled walk-in shower plus a separate tub, with the extra drains, supply lines and valves that requires
  • Frameless glass shower enclosure
  • A new vanity, toilet and fixtures in their new places
  • Recessed lighting
  • Tile floors
  • Paint

Why the price lands here

Moving a fixture moves its drain, and on a slab foundation, common across Southern California, that can mean cutting the concrete floor to reach it. Two wet areas instead of one means two areas to waterproof. Frameless glass is thick and custom-cut to the opening, and a new lighting plan means new wiring in the ceiling.

What pushes it higher

A freestanding tub with a floor-mounted filler, a double vanity with custom cabinetry, a heated floor, or making the room larger.

Not included

  • Permits and permit fees

03 / FLOORING

How much does new flooring cost per square foot in Southern California?

Flooring is priced per square foot of floor, installed, and the material is only part of the story. What has to come up first, and what the floor underneath looks like once it does, can move a job from one tier to the next. That is why the middle tier below is defined by the tear-out, not the plank. Leveling is included where the floor needs it; a floor that is badly out of level can push any tier higher.

Every tier is priced per square foot of floor, installed, and stairs are priced separately, per step. A room is measured wall to wall, and closets count when the new floor runs into them.

Stairs: $150–$300 per step, installed. Each step is cut, fitted and finished with a nosing by hand, which is why stairs are priced per step instead of per square foot. Open-sided or curved stairs push toward the top of the per-step range.

Plan the flooring project in the HOMEFRONT studio →
  1. Low$10–$12 per sq ft
  2. Mid$12–$18 per sq ft
  3. High$18–$30 per sq ft

LOW

Carpet out, laminate or vinyl plank in

Starting at$10 per sq ftMost projects: $10–$12 per sq ft.

Who it fits. Carpeted bedrooms, hallways and living areas going to a hard floor that is easy to keep clean.

What the work involves

  • Remove the carpet, pad, tack strip and staples
  • Prepare the subfloor and level it where needed
  • Install laminate or vinyl plank as a floating, click-together floor
  • Install new baseboards

Why the price lands here

Carpet comes up with little effort and leaves a floor that is usually ready after cleanup and leveling. Floating plank floors lock together without glue or nails, so they go down efficiently. New baseboards are included, so the edges look finished instead of patched.

What pushes it higher

Many small rooms, closets and doorways, which mean more cuts, more transitions and more trim.

Not included

  • Stairs, priced per step
  • Permits and permit fees, where a permit applies

MID

The same planks, a harder floor to remove

Starting at$12 per sq ftMost projects: $12–$18 per sq ft.

Who it fits. Homes replacing an old wood floor that is glued or nailed down.

What the work involves

  • Remove the existing wood floor, whether glued or nailed down
  • Repair and level the subfloor where needed
  • Install laminate or vinyl plank
  • Install new baseboards

Why the price lands here

Pulling up a glued or nailed wood floor is labor-heavy, dusty work, and it often leaves adhesive or damaged subfloor that has to be fixed before anything new goes down. The new floor is the same as the low tier; the extra cost is the removal and the prep.

What pushes it higher

Adhesive that has to come off a concrete slab (older black adhesives can contain asbestos, so they should be lab-tested before anyone scrapes or grinds them), or a subfloor that needs more than spot repair.

Not included

  • Stairs, priced per step
  • Permits and permit fees, where a permit applies

HIGH

Engineered wood or tile

Starting at$18 per sq ftMost projects: $18–$30 per sq ft.

Who it fits. Homes that want real wood on top, or the permanence of tile.

What the work involves

  • Remove the existing floor
  • Level the floor where needed
  • Install engineered wood or tile
  • Install new baseboards

Why the price lands here

Tile is set by hand, one piece at a time, over a flat, prepared floor with thinset, careful layout, cuts and grout. Engineered wood carries a real wood surface and is installed more carefully than a floating plank, often glued to the slab. Both demand a flatter floor and more skilled labor.

What pushes it higher

Large-format tile, which needs an especially flat floor, herringbone and other patterns, or wide premium planks.

Not included

  • Stairs, priced per step
  • Permits and permit fees, where a permit applies

04 / ROOFING

How much does a new shingle roof cost in Southern California?

These ranges cover composition (asphalt) shingle roofs on a single-story Southern California home of about 1,800–2,500 sq ft. Two-story homes cost more for the same roof area, because access, fall protection and getting the old material down all add labor; they need an on-site look and sit outside these ranges. Tile, metal and flat roofs are different jobs and are not covered here. California's cool-roof rules also apply, with exceptions, when roughly half or more of a shingle roof is replaced or re-covered in energy climate zones 4 and 8 through 15, which cover most of inland Southern California. That steers the shingle choice, and the building department confirms what applies to a given house.

For comparison, HomeGuide's 2026 guide puts asphalt shingle roofs at about $3 to $6 per sq ft installed nationally, and one California roofing contractor's 2026 guide puts them at about $4.50 to $9 in California. Those figures are per square foot of roof, which runs larger than the floor area of the house. The tear-off range here assumes deck repair, metal edging, flashing and synthetic underlayment, which some guides price separately.

Plan the roofing project in the HOMEFRONT studio →
  1. Overlay$8K–$15K
  2. Tear-off$15K–$30K+
  3. Full redeck$22K–$40K

OVERLAY

A second layer, with real limits

Starting at$8,000Most projects: $8K–$15K.

Who it fits. Very few homes. HOMEFRONT does not recommend an overlay; it only makes sense when the roof qualifies and the homeowner accepts the tradeoffs.

What the work involves

  • Confirm the roof has a single existing layer and a sound surface
  • Install new shingles over that layer
  • No tear-off and no new underlayment

Why the price lands here

Skipping the tear-off removes the demolition, the disposal and the underlayment, which is why the price is lower. The tradeoff is that the deck can't be seen or repaired from above, the roof carries extra weight, and the next roofer removes two layers instead of one. California's residential code (CRC R908.3.1.1, as Highland's reroof handout cites it) does not allow a re-cover where the roof already has two or more layers.

What pushes it higher

A larger or steeper roof, premium shingles, or cool-rated shingles where the Energy Code requires them.

Not included

  • Permits and permit fees
  • Deck repair, which an overlay cannot reach

TEAR-OFF

The standard way to replace a shingle roof

Starting at$15,000Most projects: $15K–$30K. Can run higher.

Who it fits. Most shingle roofs at the end of their life. This is the option HOMEFRONT recommends.

What the work involves

  • Remove all shingles and underlayment down to the deck
  • Inspect the decking
  • Repair or replace up to 10% of the plywood
  • Install metal drip edge and new flashing at the vents
  • Install synthetic underlayment
  • Install the new shingles

Why the price lands here

Taking the roof down to the deck is the only way to see what the old roof has been hiding. Underlayment is the second line of defense against water, and the edges and the openings around vents are where many leaks begin, so all of it is new. Up to 10% of the plywood is included because some soft or damaged decking is normal on an older roof.

What pushes it higher

Premium shingles, a steep or cut-up roof, or more than 10% damaged decking.

Not included

  • Permits and permit fees

FULL REDECK

New shingles on a new deck

Starting at$22,000Most projects: $22K–$40K.

Who it fits. Roofs whose decking is past repair: widespread rot or delamination, or older homes built with spaced board sheathing.

What the work involves

  • Everything in the tear-off
  • New plywood across the whole roof, replacing damaged decking or covering spaced boards

Why the price lands here

When too much of the deck is soft, a patchwork of repairs costs nearly as much as replacing it and leaves a weaker roof. On older homes with spaced board sheathing, building departments such as Highland's require new panel sheathing over the boards once they are exposed. The new plywood, and the labor to install it, is the difference from the tear-off.

What pushes it higher

A larger roof, or rafter and fascia repairs found once the deck is off.

Not included

  • Permits and permit fees

WHERE THESE NUMBERS COME FROM

Who set these ranges, and how?

They are HOMEFRONT's own working ranges, supplied by HOMEFRONT for Southern California planning and reviewed on October 14, 2026. They describe typical projects in each tier, not the cheapest or the most expensive job anyone has seen. The roofing ranges were checked against published 2026 roofing cost guides, and the size references and code notes cite the sources listed here.

HOMEFRONT shares these ranges as homeowner research. They are not a quote, bid or offer. Any real price comes from a written proposal for your home. See HOMEFRONT's pre-launch and legal information.

Updated · HOMEFRONT WORKING RANGES · NOT A QUOTE · PERMITS AND APPLIANCES NOT INCLUDED.
Your ideas, written down.

HOMEFRONT / PROJECT NOTES

Start with your home.

Organize your ideas here. Online inquiry delivery is not connected, so nothing is sent to HOMEFRONT.

Keep personal details and your exact address out of these notes. They remain on this page unless you choose to copy or download them.

View text to copy